The simplified structural design of aircraft flooring significantly reduces material consumption and has been widely adopted by airlines, manufacturers, and aircraft maintenance enterprises. Primary applications include the upper deck areas, galleys, cockpits, and lavatories of various aircraft types. The flooring system offers unparalleled performance advantages: moisture resistance, sound insulation, noise reduction, and luminous properties.
12-second vertical burn test: Meets CCAR 25.853 & App. F and EASA CS 25.853 & App. F standards
Compliant with D6-36075 F TABLE 4 standards
Compliant with EU REACH Regulations
High quality thickened PVC wear layer for increased wear resistance.
Aircraft, vessels, and specialty vehicles.
Description |
||
Thickness |
0.0591-0.13 in. |
(1.5-3.3mm Customisable ) |
Width: |
4.92-8.2 ft |
(1.5-2.5 m Customisable ) |
Length |
65.62 ft |
(20 m Customisable) |
Weight |
74 oz/sq ft |
(2100 g/m²/1.5 mm) |
Surface |
Circular, wood grain |
|
Recommended Applications |
|
Aircraft, specialty vehicles, marine vessels |
Toxic Gas Detection Data |
Standard |
Result |
CO | ≤3500 | 2212 |
HCN | ≤150 | 40 |
HF | ≤200 | 41 |
HCI | ≤500 | 313 |
SO2 | ≤100 | 26 |
NOX | ≤100 | 34 |
12-Second Vertical Burning Test |
Standard |
Result |
Duration of Continuous Burning | ≤15 | 0 |
Drip Combustion Duration | ≤5 | 0 |
Burning Length (mm) |
≤203 | 24 |
Factory direct sales
10+ Years
200+ employees
More than 78 quality inspections,4 patents
7500+ customers,200+ agents
30,000 square metres daily output
Before installing the PVC Aircraft flooring, spread it out for 1-2 days to allow the PVC flooring to fully acclimatise to the environment.
01. Check whether the aircraft cabin is level or not.
02. Clean the floor and apply the glue. Then use the equipment to blow the floor for about 30 minutes, so that the adhesive glue reaches the highest viscosity.
03. Lay the PVC sports flooring in sequence along the side of the aircraft cabin and cut off the excess.
04. Use the machine to cut the groove between the PVC flooring, so that it is easy to weld the wires into the center seam.
05. Use a welding gun to embed the welding wire into the grooves and cut off the excess wire. Makes a seamless connection between basketball court floors.
Finish by cleaning up any excess auxiliary scraps.
Roll with kraft paper ourside. Pallets are necessary for LCL.
Customization is welcomed.
We are a factory with nearly 20 years of history.
The factory has independent office space and 30,000 square meters of production workshops with 200 employees and 6 production lines,passing more than 100 tests and obtaining 4 patents.
Farfly has more than 7500 customers and 200 agents all over the world and is the long-term trusted quality manufacturer of Li Ning, Adidas and other companies.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Add : NO.5 HUAQING INTELLIGENT PARK,HUISHAN DISTRICT